Construction work is underway on Level 3, as we make a beautiful new home for our Special Collections and Archives.
We are sorry for the disturbance. Floor levering and bookshelf installation projects will go on through December 5, and will be noisy. Other work continues through December 16, but should not be as loud.
We remind everyone that quiet study, including Brody pods and study carrels, is available on Levels 4, 5, and 6, and is open to all our students. Thanks for your understanding as we build a better Rosenthal Library!